Voertuigen

The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy-Questionnaire inclusief korte informatie over het bedrijf, productieproces, lijst met kernproductiefaciliteiten, lijst met kerntestinstrumenten, bewijs van geregistreerd handelsmerk, enz.
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC Nieuws

GB-normen voor China CCC-autoproducten bijgewerkt GB-normen voor China CCC-autoproducten bijgewerkt 2019-03-17 - volgens een recente aankondiging van CNCA (China National ...
Tesla Model 3 - China Market Delivery Ceremony Tesla Model 3 - China Market Delivery Ceremony 2019-03-15 - In januari 22, 2019, de 3 Chinese marktbezorgingsceremonie ...
Retroreflectorproduct voor motorvoertuigen CCAP-markering Retroreflectorproduct voor motorvoertuigen CCAP-markering 2019-03-12 - Om de geest van de China National Ce te implementeren ...
gedetailleerde uitvoeringsregels voor audio- en videoapparatuur herzien gedetailleerde uitvoeringsregels voor audio- en videoapparatuur herzien 2019-03-10 - China Quality Certification Centre (CQC) heeft de verordening herzien ...
Nieuwe gedetailleerde implementatieregels voor mobiele voedingen voor draagbare digitale apparaten gepubliceerd Nieuwe gedetailleerde implementatieregels voor mobiele voedingen voor draagbare digitale apparaten gepubliceerd 2019-03-08 - Volgens een recente aankondiging van de China Quality C ...
De superfabriek van Tesla wordt gevestigd in Shanghai De superfabriek van Tesla wordt gevestigd in Shanghai 2019-03-07 - Zoals gemeld door Sina Auto dat op januari 7,2019 CEO van Tesla ...
gedetailleerde uitvoeringsregels voor herziene verlichtingsapparatuur gedetailleerde uitvoeringsregels voor herziene verlichtingsapparatuur 2019-03-06 - CQC (China Quality Certification Centre) onlangs herzien ...
Magna en Renesas Electronics ontwikkelen een nieuw 3D-surroundsysteem Magna en Renesas Electronics ontwikkelen een nieuw 3D-surroundsysteem 2019-03-05 - Magna en Renesas Electronics werken samen aan de ontwikkeling van ...
China CCC technische expertgroep (TC25) jaarvergadering 2019 China CCC technische expertgroep (TC25) jaarvergadering 2019 2019-03-04 - Van januari 23 tot januari 24, 2019, CQC ("China Quality ...
Audi en Hella werken samen bij de ontwikkeling van een LED-lensmodule Audi en Hella werken samen bij de ontwikkeling van een LED-lensmodule 2019-03-03 - Het dimlicht van de nieuwe Audi A8-koplampen is uitgerust met ...

Support

ondersteuning

Je werkt in je tempo. U kunt uw projecten onafhankelijk behandelen via onze portal, en informeren naar persoonlijke ondersteuning. Daarom hebben we ons gecommitteerd aan de mogelijkheid om uw eigen processen te ontwerpen

Online beheer

Online administratie

Wij bieden u de mogelijkheid om uw eigen certificeringproces uit te voeren, maar zonder af te zien van de knowhow of de ondersteuning van ervaren medewerkers. Het online systeem is ontworpen voor een verscheidenheid aan certificeringen en biedt u veelgestelde vragenlijsten, kant-en-klare formulieren en tabellen, evenals een module om open vragen te verduidelijken met een van onze medewerkers.

Wijzig de certificering

Wijzig de certificering

In onze snelle tijd zijn veranderingen in het bedrijfsleven een constante begeleiding. Het kan heel snel worden ingeslagen. Daar zijn interne en externe redenen voor. De CS geeft een overzicht van de conformiteit tijdens wijzigingen.

Samenwerking

Samenwerkingen

We hebben slechts een beperkte tijd en financiële capaciteit en willen een uitgebreide service bieden, samenwerkingsverbanden zijn alleen zinvol bij gerelateerde organisaties. Deze hebben een betrouwbare structuur, evenals een goede interpersoonlijke harmonie.

Ga naar boven