1, How long does it take from the application to the receipt of the certificate?

90 days

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: 2 - 4 man day per model series

FI audit: 1 - 2 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is work audited?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

-Application form

License in copy

Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.

Car structure and technical parameters

-COP control plan

-Declaration: how is type, series defined

-Declaration: how is VIN defined

-Explanation: we distinguish the different types by external marking

-Declaration: Operating instructions in Chinese

-COC certificate

-Review

-Quality Manual

-Quality system certificates in copy

-Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC Nieuws

10 nieuwe Chinese GB-normen uitgebracht 10 nieuwe Chinese GB-normen uitgebracht 2019-08-16 - Volgens een recente pers van de Raad van State van de VRC, ...
Explosiebeschermingsproducten CCC relevant Explosiebeschermingsproducten CCC relevant 2019-07-17 - volgens een recente aankondiging van CNCA, explosiebeveiliging ...
374 nieuw en herzien GB-normen vrijgegeven 374 nieuw en herzien GB-normen vrijgegeven 2019-07-09 - Volgens een recente pers van de Raad van State van de VRC, ...
173 nieuw en herzien GB-normen vrijgegeven 173 nieuw en herzien GB-normen vrijgegeven 2019-06-16 - Volgens een recente pers van de Raad van State van de VRC, ...
business scopes van geaccrediteerde testlaboratoria voor CCC-producten bijgewerkt business scopes van geaccrediteerde testlaboratoria voor CCC-producten bijgewerkt 2019-05-30 - volgens een recente aankondiging van CNCA, business scope ...
Geely heeft een technisch R & D-centrum in Duitsland opgezet Geely heeft een technisch R &amp; D-centrum in Duitsland opgezet 2019-05-18 - Volgens de China News Service Beijing op mei 16 dat ...
Uitvoeringsregels voor stedelijke spoortransituitrusting vrijgegeven Uitvoeringsregels voor stedelijke spoortransituitrusting vrijgegeven 2019-05-06 - Volgens een recente aankondiging van de China-certificering ...
business scopes van testlaboratoria voor China CCC-producten bijgewerkt business scopes van testlaboratoria voor China CCC-producten bijgewerkt 2019-04-29 - business scopes van geselecteerde testlaboratoria voor China CCC ...
21 nieuw en herzien GB-normen vrijgegeven 21 nieuw en herzien GB-normen vrijgegeven 2019-04-19 - Volgens een recente pers van de Raad van State van de VRC, ...
177 nieuw en herzien GB-normen vrijgegeven 177 nieuw en herzien GB-normen vrijgegeven 2019-04-04 - Volgens een recente pers van de Raad van State van de VRC, ...

Support

ondersteuning

Je werkt in je tempo. U kunt uw projecten onafhankelijk behandelen via onze portal, en informeren naar persoonlijke ondersteuning. Daarom hebben we ons gecommitteerd aan de mogelijkheid om uw eigen processen te ontwerpen

Online beheer

Online administratie

Wij bieden u de mogelijkheid om uw eigen certificeringproces uit te voeren, maar zonder af te zien van de knowhow of de ondersteuning van ervaren medewerkers. Het online systeem is ontworpen voor een verscheidenheid aan certificeringen en biedt u veelgestelde vragenlijsten, kant-en-klare formulieren en tabellen, evenals een module om open vragen te verduidelijken met een van onze medewerkers.

Wijzig de certificering

Wijzig de certificering

In onze snelle tijd zijn veranderingen in het bedrijfsleven een constante begeleiding. Het kan heel snel worden ingeslagen. Daar zijn interne en externe redenen voor. De CS geeft een overzicht van de conformiteit tijdens wijzigingen.

Samenwerking

Samenwerkingen

We hebben slechts een beperkte tijd en financiële capaciteit en willen een uitgebreide service bieden, samenwerkingsverbanden zijn alleen zinvol bij gerelateerde organisaties. Deze hebben een betrouwbare structuur, evenals een goede interpersoonlijke harmonie.

Ga naar boven